Implementation
Trenching, Ducting & Backfilling
Breaking / Trenching the civil path
from the exchange to the FDTs.
Installation of manhole (MH).
Laying the feeder pipes.
Asphalting.
Milling & Paving.
Cable Blowing or Pulling
Pulling feeder cables from exchange
to FDTs.
Terminate feeder cables into FDT’s
splitters.
Preparation & installation of joint
closures inside Mhs HHs.
Splice feeder cables into joint closures
Mhs, HHs.